Strategic workforce planning

Headcount budgets tell you what you can afford. Workforce planning tells you which work you will not be able to do — and what to do about it before it bites.

Phronesis Editorial5 min read

Most organisations plan their workforce by taking last year's headcount, adjusting it for the budget, and calling the result a plan. That is a spending decision, not a workforce plan, and it answers a question nobody asked: how many people can we afford? The question that matters is which work we will not be able to do in eighteen months, and what we are going to do about it now.

Workforce planning is the discipline of connecting business demand to the supply of skills, over a horizon long enough that action is still possible. Done properly it is unglamorous, numerical and slightly uncomfortable, because it usually reveals that the organisation has been hiring for the wrong things.

Demand: what work, and what skills

Begin with the business, not the establishment list. What is the organisation trying to do over the next twelve to thirty-six months — new markets, new products, automation, consolidation, regulatory change — and what work does that create?

Then translate the work into skills, not job titles. "We need three more accountants" is a headcount statement. "We need cost accounting capability for a plant that does not exist yet, and IFRS consolidation experience we currently buy in" is a workforce statement, and it leads somewhere different.

Useful demand questions:

  • Which activities will grow, shrink or disappear, and by when?
  • What will we need to do that we cannot do at all today?
  • Which capabilities are becoming scarce in the external market, and which are becoming commoditised?
  • What does the customer or regulator require that we currently meet with one person and no backup?

Separate replacement from growth

Two numbers, often conflated: the people you need because the work is growing, and the people you need because someone is leaving. Replacement demand is predictable in aggregate even when it is unpredictable in individual cases, and it is where most planning fails — because the retirement or resignation is treated as a surprise each time it happens, despite being visible for years.

Supply: who you have, and who is leaving

The internal picture is usually worse documented than the external one. A skills inventory does not need to be a system; it needs to be accurate for the roles that matter.

  • Critical roles. The ten or twenty jobs where a vacancy would stop something important. Not the most senior — the most load-bearing.
  • Concentration risk. Any capability held by one person, or by one person over fifty-five, or by a contractor on a rolling engagement.
  • Attrition patterns. Which teams lose people, at what tenure, and where they go. A team that loses everyone at eighteen months has a design problem, not a recruitment problem.
  • Internal mobility. How many vacancies were filled internally last year, and whether that number is falling because the pipeline is thin or because nobody looks.

The gap, stated plainly

Lay demand and supply against each other and name the gaps in order of consequence. Not a list of every shortfall — the three or four that will actually damage the business if unaddressed.

A workforce plan that lists forty actions is a wish list. One that lists four, with owners and dates, is a plan.

For each gap, you have four options, and it is worth considering all four before defaulting to recruitment, which is the slowest and most expensive:

  1. 01Build. Train and develop internally. Slowest, cheapest, best for retention — and useless if the gap is urgent.
  2. 02Buy. Recruit externally. Fastest for a proven skill, most expensive, and dependent on a market you do not control.
  3. 03Borrow. Contract, interim or managed service. Appropriate for peaks, projects and capabilities you do not need permanently.
  4. 04Change the work. Automate it, simplify it, stop doing it, or reorganise it so fewer people with different skills can cover it. Consistently the least considered option and often the correct one.

Plan for more than one future

A single-point forecast is a guess with a spreadsheet around it. Two or three scenarios are enough: a base case, a downside, and an upside. For each, ask what the workforce implication is and — more importantly — which decisions are the same in all three.

Those decisions are the plan. Anything that only makes sense in one scenario waits for evidence.

The Irish dimension

Three things shape workforce planning for organisations operating here more than they shape it elsewhere.

The first is market size. Specialist pools are small, and the same fifty people appear on every shortlist. That makes salary benchmarking less useful than knowing individuals, and it makes the build option more attractive than it looks on a cost spreadsheet.

The second is competition that is no longer local. Remote and hybrid arrangements mean a Dublin-based role competes with employers in London, Berlin and Boston for the same person. A plan that assumes the relevant labour market is the commutable radius will understate both cost and difficulty.

The third is the regulatory and statutory environment, which changes on a schedule the organisation does not control. Where a change creates a capability requirement — a compliance function, a reporting line, a new qualification — the lead time to hire is usually longer than the lead time to comply.

Make it a live document, owned by someone

Workforce plans fail in a predictable way: they are produced once, presented well, and never opened again. Avoid that with three commitments.

  • One owner. Usually the HR or people lead working with the finance lead, not a committee.
  • A quarterly review, thirty minutes, against four or five tracked measures: critical-role cover, internal fill rate, time-to-hire for critical roles, attrition in the first year, and progress on the build actions.
  • A visible link to the recruitment plan. Every external hire should be traceable to a gap in the workforce plan. If it is not, either the plan is wrong or the hire is.

Build the one-page version this month

You do not need a system to start. A single page, reviewed quarterly, is enough to change decisions:

  1. 01Business changes in the next twelve to twenty-four months, in three lines.
  2. 02Critical roles — the ten to twenty that matter most, with a named current holder and a cover rating of strong, thin or none.
  3. 03The three biggest gaps, each with a chosen response: build, buy, borrow or change the work.
  4. 04Actions with owners and dates for the next two quarters. Anything without a date is not an action.
  5. 05The one risk you are choosing to accept, written down, so that accepting it is a decision rather than an oversight.

That page will be more useful than a fifty-page strategy document, because it will be read, argued with and updated. Workforce planning is not an exercise in forecasting accuracy. It is the practice of noticing, early enough to act, that the organisation is about to run out of something it needs.